Solar PV
100kW
Wolverhampton
We installed a 100kW solar PV system with a Solaredge inverter as part of a major office development refit.
This project was notable for being the first 100 kW GSE system installed in the UK, making it a landmark installation.
A key challenge was the preparation of the roof, which required the removal of over 1,000 original tiles before any mounting or panel work could begin. This careful and methodical process ensured the roof was perfectly prepared to integrate the in-roof GSE system.
The result is a sleek, modern solar array that not only provides clean energy for the development but also sets a benchmark for future commercial installations of this type.