Bromford Housing Association
Solar PV
100kW
Tewkesbury
We installed a 100kW solar PV system using a Solaredge inverter. The client required enhanced fire safety measures, so we incorporated system optimisation and rapid shutdown capabilities to provide advanced protection and easier isolation in the event of an emergency.
As part of the project, we also removed the site’s existing inverters, replacing them with a new SMA unit alongside the new Solaredge equipment. This allowed us to modernise the system and integrate it with the new solar array for improved performance and safety.
The result is a fully upgraded solar installation that meets the client’s operational needs while offering a higher level of protection and long-term reliability.